Capital Improvement Projects
-
Advanced Traffic Management System
Replacing the city’s outdated traffic controllers and wirelessly connecting signals to Clark County’s ATMS system, allows for remote monitoring of the city’s signals.
-
NW 12th Avenue / NW 1st Street Improvements
SR 502/503 Congestion Relief Project - Phase 5: Safety and Operational improvements along NW 1st Street from NW 12th to NW 15th Avenue.
-
SE Grace Avenue Phase II
Reconstruction of SE Grace Avenue between East Main Street and SE Rasmussen Boulevard. The project includes aligning the SE Grace Ave with NE Grace Ave at East Main Street and signalizing the new intersection,
-
SR 502/503 Intersection Improvements
Dedicated right turn lanes will be constructed in the eastbound, westbound, and southbound directions of the intersection along with a second left turn lane in the northbound direction.
-
SR 503 Shared Use Pathway
Construction of a 10’ wide shared use pathway along the east side of SR 503 between W Main Street and NW Onsdorff Boulevard, providing increased safety for pedestrians and bicyclists along the high-speed thoroughfare.
-
SW Eaton Boulevard Improvements
SW Eaton Boulevard will be reconstructed to a 3 lane section including bike lanes and sidewalks between SW 20th Avenue and SR 503. A signal will be added to the intersection of SW 20th Avenue and SW Eaton Boulevard. An eastbound right turn lane and a second westbound left turn lane will be added to the intersection of SR 503 and SW Eaton Boulevard.
-
NW 5th Street
SR502/503 Congestion Relief Program - Phase 6 Alternate access to northbound SR 503 will allow motorists to avoid the SR 503/SR 502 intersection.
-
15th Avenue/Main Street Improvements
Improving operations at the 15th Avenue & Main Street intersection by adding a second southbound left-turn lane, by adding flashing yellow signals in the eastbound and westbound directions, and lengthening the left turn pockets in the eastbound and westbound directions.
-
Completed Projects
The SR 502/503 Congestion Relief Project consists of several phased capital improvement projects. View completed phases here.
-
SR 503-NW Onsdorff Boulevard Intersection Improvements
Analysis and design of the intersection at SR 503 and Onsdorff Boulevard.