  • A permit is not required for PODS that are placed on residential property for 30 days or less.
    • PODS shall be placed on a driveway or other paved surface on property.
    • At no time shall the POD block pedestrian sidewalks; however, it can be placed curbside in a legal parking area with a ROW (right of way) permit & a fee.
  • Applying for a permit see: "Permit Application Process"
    • Please upload your ROW permit application during the online process.
    • We will need a plot plan showing POD placement. 
  • ROW fee: Please see our Fee Schedule