Funding

Preliminary Engineering$145,000$0$145,000
Right-of-Way$755,000$0$755,000
Construction$415,000$2,485,000$2,900,000
PROJECT TOTAL$1,315,000$2,485,000$3,800,000


City Funds*State FundsPhase Total

*State Funding are provided through the Washington State Department of Transportation Connecting Washington Program.

Project Timeline

Preliminary Engineering (PE)2021 - 1st Quarter2025 - 4th Quarter
Right-of-Way (ROW)2025 - 1st Quarter2026 - 1st Quarter
Construction (CN)2026 - 2nd Quarter2027 - 1st Quarter

*Yellow indicates current project phase.

Design

Before the intersection design is determined, the project will first undergo alternative analysis.  This analysis involves the forecasting of the future demand for the base model and the testing of various project alternatives to determine the optimally performing solution.  Factors such as (but not limited to) traffic safety, transportation standards, and geographical characteristics will be considered when determining the final design.  

The following schematics show the preliminary design concepts for the SR 503 and NW 5th Street intersection improvement:

(Select each map below to expand the view.)

Roundabout Concept

NW 5th Street Concept - Roundabout

Right-in/Right-out Concept

NW 5th Street Concept - Right in Right Out

Traffic Signal Concept

NW 5th Street Concept - Traffic Signal

Project Location

Map - NW 5th Street